Painting the castings is going a lot faster than I thought it would. The single oil drums are done and this large group is about three quarters done. Then I need to do some of the tiny ones and some of the machinery that’s still left, such as the donkey engine and the boiler.


Posted on February 18th, 2008 by quinn
Filed under: Structures, The Twin Mills
?? ??????,?????? ? ??????=)…
???????? ?? ??????? Painting the castings is going a lot faster than I thought it would. The single oil drums are done and this large group is about three quarters done…..
?? ????? ??????, ??? - ????????….
???????? ???????? Painting the castings is going a lot faster than I thought it would. The single oil drums are done and this large group is about three quarters done…..