I just spilled a bottle of floquil grimy black over about a quarter of my castings.
On the plus side they weren’t the best ones and I reacted quickly enough to get some of it off. But those are going to be darker than I planned and some of the details will have to […]
Posted on February 21st, 2008 by quinn
Filed under: Structures, The Twin Mills | 3 Comments »
Painting the castings is going a lot faster than I thought it would. The single oil drums are done and this large group is about three quarters done. Then I need to do some of the tiny ones and some of the machinery that’s still left, such as the donkey engine and the boiler.
Posted on February 18th, 2008 by quinn
Filed under: Structures, The Twin Mills | 2 Comments »
I built this last weekend, it’s straight out of the box and hasn’t even been weathered yet. I’ll add the roof parts later after I add some lights and interior detail. I can’t install the turntable until I know just where the roundhouse is going so I got this kit and put it […]
Posted on February 17th, 2008 by quinn
Filed under: Structures, Layout | 1 Comment »